National Shipbuilding Research Program. 1993 Ship Production Symposium. Paper No. 21: The Lay-Up and Reactivation of LNG Tankers: Lessons Learned.

机译:国家造船研究计划。 1993年船舶生产研讨会。第21号文件:LNG油轮的铺设和重新启动:经验教训。

获取原文

摘要

The Liquid Natural Gas (LNG) Industry went from a projected boom in the 1970's to a contracted industry in the 1980's, when many ships were either permanently or temporarily laid up. In the 1990's, many laid up LNG carriers are being reactivated after as many as 12 years in lay-up. While the capital cost of an LNG carrier should dictate maximum preservation of the asset, the LNG industry is not immune to having to make hard economic decisions during slack times. In this paper, the authors present specific alternate lay-up procedures, together with the relative costs of these alternatives. LNG carriers are steam vessels, as are many of the vessels in the Ready Reserve Fleet (RRF). However, many of the conclusions reached can also be applied to motor vessels, and as such could be of interest to operators and shipyards in all phases of the RRF program. The subjects of dehumidification, inert gas plants, ballast tank coatings and drydocking, among others, will be discussed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号