首页> 美国政府科技报告 >PART I: Bioventing Pilot Test Work Plan for PS-3 (Pumphouses 2 and 3) and PS-4 (Bulk POL Stoarage Area), Malmstrom AFB, Montana. PART II: Draft Interim Pilot Test Results Report for PS-3 (Pumphouses 2 and 3) and PS-4 (Bulk POL Storage Area), Malmstrom AFB, Montana
【24h】

PART I: Bioventing Pilot Test Work Plan for PS-3 (Pumphouses 2 and 3) and PS-4 (Bulk POL Stoarage Area), Malmstrom AFB, Montana. PART II: Draft Interim Pilot Test Results Report for PS-3 (Pumphouses 2 and 3) and PS-4 (Bulk POL Storage Area), Malmstrom AFB, Montana

机译:第一部分:蒙大拿州malmstrom空军基地的ps-3(泵房2和3)和ps-4(散装pOL stoarage区域)的生物通风试验工作计划。第二部分:蒙大拿州malmstrom空军基地ps-3(泵房2和3)和ps-4(散装pOL存储区)临时试点测试结果报告草案

获取原文

摘要

This work plan presents the scope of multiphase bioventing pilot tests for in situ treatment of fuel-contaminated soils at PS-3 (Pumphouses 2 and 3) and PS-4 Bulk Petroleum, Oils, and Lubricants (POL) Storage Area at Malmstrom Air Force Base (AFB) (the Base), Montana. The pilot tests will be performed by Engineering-Science, Inc. (ES). The three primary objectives of the proposed pilot tests are: 1. To assess the potential for supplying oxygen throughout the contaminated soil interval, 2. To determine the rate at which indigenous microorganisms will degrade fuel when supplied with oxygen-rich soil gas, and 3. To evaluate the potential for sustaining these rates of biodegradation until fuel contamination is remediated to concentrations below regulatory standards.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号