首页> 美国政府科技报告 >Part I: Bioventing Pilot Test Work Plan for Installation Restoration Program Sites 3 and 18. Fire Protection Training Area No. 1 (Site 3). Bulk Fuel Storage Area (Site 18), Beale Air Force Base, California. Part II: Draft Interim Pilot Test Results for Installation Restoration Program Sites 3 and 18. Fire Protection Training Area No. 1 (Site 3). Bulk Fuel Storage Area (Site 18), Beale Air Force Base, California
【24h】

Part I: Bioventing Pilot Test Work Plan for Installation Restoration Program Sites 3 and 18. Fire Protection Training Area No. 1 (Site 3). Bulk Fuel Storage Area (Site 18), Beale Air Force Base, California. Part II: Draft Interim Pilot Test Results for Installation Restoration Program Sites 3 and 18. Fire Protection Training Area No. 1 (Site 3). Bulk Fuel Storage Area (Site 18), Beale Air Force Base, California

机译:第一部分:安装修复计划场地3和18的生物通道试验工作计划。第1号消防培训区(场地3)。加利福尼亚比尔空军基地散装燃料储存区(18号站点)。第二部分:安装恢复计划场地3和18的临时试点测试结果草案。第1号消防培训区(场地3)。加利福尼亚比尔空军基地散装燃料储存区(18号站点)

获取原文

摘要

This Pilot Test Work Plan presents the scope of two in situ bioventing pilot tests for treatment of fuel contaminated soils at Installation Restoration Program (IRP) Sites 3 and 18 at Beale AFB, California: Fire Protection Training Area (Site 3); and, Bulk Fuel Storage Area (Site 18). The location of all 24 IRP sites at Beale AFB, including Sites 3 and 18, are shown on Figure 1.1. These pilot tests have three primary objectives: (1) to assess the potential for supplying oxygen throughout the contaminated soil depth, (2) to determine the rate at which indigenous microorganisms will degrade fuel when stimulated by oxygen rich soil gas, and (3) to evaluate the potential for sustaining these rates of biodegradation until fuel contamination is remediated below regulatory standards.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号