Navy Contract: AOE 6 Shipbuilding Claims Settled but More Delays and Cost Growth Likely.

机译:海军合同:aOE 6造船索赔落户但延迟和成本增长可能增加。

获取原文

摘要

In January 1987, the Navy awarded National Steel and Shipbuilding Company (NASSCO), San Diego, California, an $862.9-million, fixed-price incentive contract for the detailed design and construction of the first AOE 6 class ship, with options for three additional ships (AOE 7 through 9). However, the program schedule slipped, costs increased, the Navy did not exercise the AOE 9 option, and it reduced the program from seven to four ships. By February 1991, NASSCO had submitted over $300 million in claims against the Navy for cost increases it believed the Navy was responsible for. As a result, the House and Senate Committees on Appropriations Conferees Directed GAO to monitor the claims resolution process. Specifically, GAO'S objectives were to identify the reasons for program cost growth and to document the procedures the Navy followed in its AOE 6 claims settlement process. In addition, GAO assessed whether the Navy would incur further program cost increases and schedule delays.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号