...
首页> 外文期刊>Steel Construction Today & Tomorrow >Development and Application of New Jack-down Demolition Method for High-rise Buildings
【24h】

Development and Application of New Jack-down Demolition Method for High-rise Buildings

机译:高层建筑顶升拆除新方法的开发与应用

获取原文
获取原文并翻译 | 示例
           

摘要

The demolition of high-rise buildings has thus far been carried out by starting from the upper stories and working downward to the lower stories. In the newly developed "jack-down method," jacks are installed just beneath the lst-floor columns, and the building is demolished beginning from the lowest story. Continuing upwards, the columns of each floor are cut and the floors are successively jacked down. In order to secure seismic safety during demolition, a reinforced-concrete "core wall" and a steel-structure "load transfer frame" are newly installed inside the building.
机译:迄今为止,高层建筑的拆除是从高层开始到向下层进行的。在新开发的“千斤顶压下法”中,千斤顶安装在第一层立柱的正下方,从最低层开始拆除建筑物。继续向上,每层地板的立柱被切割,地板依次被顶起。为了确保拆除时的地震安全性,建筑物内新安装了钢筋混凝土“芯墙”和钢结构“荷载传递框架”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号