【24h】

Casa Gigante

机译:巨人之家

获取原文
获取原文并翻译 | 示例
           

摘要

With a scope making the word "grande" an understatement, the new 59.7 million dollars Vista Grande High School under construction in Casa Grande is a mammoth undertaking. Tempe-based construction-manager at-risk Sundt Construction broke ground on the 260,000-sq-ft school on Dec. Ist, 2007. The project is comprised of four main components: academic, careers and technology, performing arts and gym/athletics. "When we were first programming the facility and looking at how these components fit together, it became clear that they could be arranged around a central courtyard theme," says Keith Long, AIA, project manager with the Phoenix office of architect NTD Architecture. The largest structure, the 137,808-sq-ft Building One, will house a two-story academic wing where the bulk of classrooms and labs will be.
机译:凭借轻描淡写的“大”字眼,在卡萨格兰德兴建的耗资5970万美元的Vista Grande高中是一项艰巨的任务。基于Tempe的建筑经理高风险Sundt Construction于2007年12月1日在占地260,000平方英尺的学校破土动工。该项目包括四个主要部分:学术,职业和技术,表演艺术和体育馆/体育馆。 NTD建筑事务所凤凰城项目经理AIA的基思·朗(Aeia)说:“当我们第一次对设施进行编程并研究这些组件如何组合在一起时,很明显它们可以围绕中央庭院主题布置。”最大的建筑是137,808平方英尺的一号楼,将容纳一个两层楼的学术楼,其中将有大量的教室和实验室。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号