首页> 外文期刊>Southwest Contractor >Savoring Sandia/New Hotel to Give Gamblers More Time to Enjoy Gaming , Dining
【24h】

Savoring Sandia/New Hotel to Give Gamblers More Time to Enjoy Gaming , Dining

机译:品尝桑迪亚/新酒店,让赌徒有更多时间享受游戏,餐饮

获取原文
获取原文并翻译 | 示例
           

摘要

The Sandia Pueblo Casino in northern Albuquerque is hoping to cash in on even more gamblers and visitors with the construction of a new 280-room hotel, 38,ooo-sq.-ft. convention center, golf course and clubhouse. If the project is successful, plans call for another 220 rooms to be added in the future. The- Albuquerque office of McCarthy Building Cos. picked up the project with Phoenix-based 3D International acting as the owner representative. The project is east of Interstate 25 on Tramway Boulevard. Work on the seven-story building started in April 2004 with sitework and utilities. Contractors are aiming for a November completion on the 80 million dollars project. The Sandia Pueblo planned the 400.000-sq.-ft. project several years ago, but everything was delayed after Sept. 11. "It's a fast-track, but we have most of the same subcontractors that we did on the casino," said McCarthy project director Jim Brandt. "It's not a design-build, but we are building it as fast as a design-build project."
机译:阿尔伯克基北部的桑迪亚镇赌场(Sandia Pueblo Casino)希望通过建造38平方英尺的新280间客房的酒店来吸引更多的赌徒和游客。会议中心,高尔夫球场和俱乐部会所。如果项目成功,计划要求将来再增加220间客房。麦卡锡大厦公司(McCarthy Building Cos。)的Albuquerque办公室由位于凤凰城的3D International担任业主代表来接手该项目。该项目位于电车大道25号州际公路以东。这座七层楼的建筑从2004年4月开始进行现场工作和公用事业。承包商的目标是在十一月完成8000万美元的项目。桑迪亚镇(Sandia Pueblo)规划了400.000平方呎。麦卡锡项目总监吉姆·布兰特(Jim Brandt)说,这是几年前的项目,但一切都在9月11日之后被推迟。“这是一条快速通道,但我们拥有与赌场相同的大多数分包商。” “这不是设计构建,但是我们正在像设计构建项目一样快地构建它。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号