Gusszentrum Ostfriesland (GZO), the newly built foundry of wind power systems manufacturer Enercon GmbH has started up a sand regeneration system with an output of 60t/h. Plant design and construction were carried out by Forder- und Anlagentechnik GmbH (F.A.T.) a leading manufacturer of foundry production facilities for large and medium-sized castings.
展开▼
机译:风力发电系统制造商Enercon GmbH的新建铸造厂Gusszentrum Ostfriesland(GZO)已启动了产能为60t / h的制砂再生系统。工厂设计和建造由Forder- und Anlagentechnik GmbH(F.A.T.)进行,该公司是大中型铸件铸造生产设施的领先制造商。
展开▼