Joint Operating Agreement: Consent Election Joint Operating Agreement: Commencement of Drilling Operations

机译:联合经营协议:同意选举联合经营协议:钻井作业开始

获取原文
获取原文并翻译 | 示例
           

摘要

Anadarko and Valence are parties to a joint operating agreement where Anadarko is the operator. On December 14, 1999, Valence proposes the immediate drilling of 4 wells and gives Anadarko 30 days to consent to the project under the terms of the JO A. Anadarko does not consent to the drilling program and pursuant to the JOA, Valence becomes the operator for the proposed wells. The JOA further provides that a party proposing a new drilling program must commence work within 90 days of the election notice being sent out and complete the project with due diligence. Valence prepares an AFE in December 1999, receives a topographic map of the well locations and stakes the locations in January 2000, and receives drilling permits from the Railroad Commission on March 16, 2000. The wells are not spudded until after March 17, 2000. Anadarko files this action asserting that Valence did not commence operations before the contractual deadline and thus breached the JOA. The jury finds that Valence did not commence the drilling operations within 60 days of the end of the 30-day consenton-consent period. It thus awards damages to Anadarko. Held: affirmed. While actual drilling or spudding the well is not required to comply with an obligation or limitation to commence drilling operations, the ultimate issue of whether a party has commenced operations is a mixed question of fact and law.
机译:阿纳达科和瓦朗斯是阿纳达科为运营商的联合运营协议的订约方。 Valence于1999年12月14日提议立即钻探4口井,并给予Anadarko 30天以JO A的条款同意该项目的权利。Anadarko不同意钻探计划,并且根据JOA,Valence成为运营商建议的井。 JOA还规定,提出新钻探计划的一方必须在发出选举通知后的90天内开始工作,并尽职调查完成该项目。瓦朗斯(Valence)于1999年12月准备AFE,于2000年1月收到井位的地形图并放样,并于2000年3月16日获得铁路委员会的钻探许可。直到2000年3月17日之后才开始钻井。阿纳达科(Anadarko)提起诉讼,声称瓦朗斯(Valence)没有在合同期限之前开始运营,因此违反了JOA。陪审团裁定,Valence在30天同意/不同意期限结束后的60天内未开始钻井作业。因此,它判给阿纳达科损失赔偿。举行:肯定。虽然不要求实际的钻井或注水井遵守开始钻井作业的义务或限制,但当事方是否已开始作业的最终问题是事实和法律的混合问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号