...
机译:
Shahid Bahonar Univ Kerman;
Fuzzy process capability indices; Triangular fuzzy number; Interval estimation; PROCESS CAPABILITY INDEXES; CONFIDENCE-INTERVAL; FUZZY;
机译:A CBR system for lesson examples on the subject "information study" - evaluation of the system performance of the system and the educational effectiveness
机译:Application of Hierarchical Analyst Domino Evaluation System (HADES) in offshore oil and gas facilities? decommissioning: A case study
机译:Evaluating DualSPHysics performance implemented in the study of heat transfer in multiphase systems with applications in nuclear reactors
机译:Integrated Evaluation of Laminated Sand-Shale Gas-Bearing Reservoir Using Tensor Model. A Case Study Combining Data from Triaxial Resistivity, Image, Sonic, And Reservoir Testing in B-Field, Malaysia
机译:两岸四地累犯制度比较研究——兼论中国内地累犯制度一体化之构想 =Comparative Study on Recidivism System in Hong Kong, Macao, Taiwan and China: Concurrently Discuss the Conception of Recidivism System Integration in Mainland China
机译:发行者更正:npj Systems Biology and Applications第5卷
机译:application of sWOT method to Evaluate the Feasibility study on Land Treatment system of Rural Wastewater
机译:Contemporary systems,Inc.,Walpole,New Hampshire solar-Energy-system performance Evaluation,1981年10月至1982年4月