...
首页> 外文期刊>Inside FERC >FERC OKs Tennessee plan to meet generator needs with new service
【24h】

FERC OKs Tennessee plan to meet generator needs with new service

机译:

获取原文
获取原文并翻译 | 示例
           

摘要

Dismissing concerns from Tennessee Gas Pipeline shippersabout potential harm to their service, the Federal Energy RegulatoryCommission has approved a new service and capacity lease for thepipeline designed to meet the needs of gas-fired generators thatrequire more flexible scheduling of transportation service.The order approves all elements of the proposal fromTennessee, including the lease of capacity on Texas intrastatepipeline and Kinder Morgan affiliate Kinder Morgan Texas Pipelineand a limited jurisdiction certificate for the intrastate pipeline.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号