GOVIATHAMESLINK Railway invited guests, including Railways Illustrated, to Selhurst depot on November 30 to show the work currently being done on the operator's fleet of Class 377 and Class 387 'Electrostar' electric multiple units. The work is being done at Selhurst by Alstom and is intended to level up the Electrostar fleet, which consists of 270 trains and a total of 1086 coaches, which were built between 2001 and 2016.
展开▼