...
首页> 外文期刊>Bioenergy insight >ReFood's £20m AD plant complete
【24h】

ReFood's £20m AD plant complete

机译:ReFood耗资2,000万英镑的AD工厂竣工

获取原文
获取原文并翻译 | 示例
           

摘要

Construction work on ReFood's new £20 million (?25 million) anaerobic digestion (AD) plant in Widnes, UK has been completed by building and civil engineering contractor Britcon. The project has now been officially handed over. The plant is the largest gas-to-grid AD facility in the UK and the second plant for the ReFood brand in the UK. It will recycle 90,000 tonnes of commercial and domestic food waste and will generate up to 17MWh of biogas which will be transported directly to the national gas grid to provide enough power for 8,000 homes.
机译:ReFood在英国威德尼斯新建的2000万英镑(2500万英镑)厌氧消化(AD)工厂的建设工作已经由建筑和土木工程承包商Britcon完成。该项目现已正式移交。该工厂是英国最大的天然气并网广告设施,也是英国ReFood品牌的第二家工厂。它将回收90,000吨商业和家庭食物垃圾,并将产生高达17MWh的沼气,这些沼气将直接输送到国家燃气网,为8000户家庭提供足够的电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号