...
首页> 外文期刊>Bioenergy insight >ReEnergy Black River to provide power to Fort Drum
【24h】

ReEnergy Black River to provide power to Fort Drum

机译:ReEnergy Black River为Fort Drum提供动力

获取原文
获取原文并翻译 | 示例
           

摘要

Renewable energy producer ReEnergy Black River has been awarded a 20-year contract by the US Defense Logistics Agency (DLA) to supply renewable energy to the Fort Drum army base in New York. This contract is the largest renewable energy project in the history of the US Army. The federal government is increasing its demand for long-term renewable energy as a result of renewable goals established in the Energy Policy Act of 2005 and the Energy Independence and Security Act of 2007. Additionally, the Army has established a goal to achieve 1GW of renewable energy by 2025.
机译:可再生能源生产商ReEnergy Black River已获得美国国防后勤局(DLA)的20年合同,向纽约的鼓堡军队基地提供可再生能源。该合同是美国陆军历史上最大的可再生能源项目。由于2005年《能源政策法》和2007年《能源独立与安全法》确立了可再生目标,因此联邦政府正在增加对长期可再生能源的需求。此外,陆军还制定了实现1GW可再生能源的目标。到2025年实现节能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号