...
首页> 外文期刊>Electronics World >THE TROUBLE WITH RF... The Test-Jig TRAP
【24h】

THE TROUBLE WITH RF... The Test-Jig TRAP

机译:射频的问题...测试夹具陷阱

获取原文
获取原文并翻译 | 示例
           

摘要

THE PROCESS OF introducing a new product or design to the marketplace has many important stages: initial specification, feasibility, design, pre-production introduction, approvals testing and full production - not to mention the parallel areas of purchasing, marketing, advertising and sales. As engineers, our tendency is to focus on the interesting parts (research, feasibility studies, prototyping) and the difficult areas (realizing the complete, final design and specification compliance testing). But, we tend to pay less attention to less glamourous tasks, such as, for instance, the test process and, in particular, the early stages of it.
机译:将新产品或设计推向市场的过程有许多重要阶段:初始规格、可行性、设计、生产前介绍、批准测试和全面生产——更不用说采购、营销、广告和销售等平行领域了。作为工程师,我们倾向于专注于感兴趣的部分(研究、可行性研究、原型设计)和困难的领域(实现完整的最终设计和规范合规性测试)。但是,我们往往不太关注不那么光鲜亮丽的任务,例如测试过程,尤其是测试过程的早期阶段。

著录项

  • 来源
    《Electronics World》 |2010年第1888期|8-9|共2页
  • 作者

    Myk Dormer;

  • 作者单位

    Radiometrix Ltd;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类 计量学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号