【24h】

Managing FPSOs in ice

机译:在冰中管理FPSO

获取原文
获取原文并翻译 | 示例
       

摘要

The industry faces some interesting challenges as it prepares to move into Arctic areas in the years ahead, and there is no basis for complacency or over-confidence in thinking that tools are in place to contend adequately with the challenges this area poses. Floating production, storage and offloading vessels (FPSOs) that work where there is ice for all or part of the year face significant design and operational challenges. Where icebergs and ice ridges are present, it is extremely difficult to design a mooring system that can resist largest ice loads, which means a quick-disconnect system is required. Furthermore, because there is virtually no data for typical ice load levels experienced by these large moored vessels, it is difficult to establish reliable guidelines for disconnection frequency and resulting downtime estimates.
机译:在准备在未来几年进入北极地区时,该行业面临着一些有趣的挑战,并且没有自满或过度自信的理由认为存在适当的工具来应对该地区带来的挑战。在全年或部分时间结冰的情况下工作的浮式生产,储存和卸货船(FPSO)面临重大的设计和运营挑战。在有冰山和冰脊的地方,设计一种能够抵抗最大冰负荷的系泊系统非常困难,这意味着需要一个快速断开系统。此外,由于实际上没有这些大型系泊船所经历的典型冰负荷水平的数据,因此难以建立可靠的断开频率和停机时间估算准则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号