...
首页> 外文期刊>E & P: A Hart Energy Publication >Experience and Success in Gulf of Mexico Prove Key to Project
【24h】

Experience and Success in Gulf of Mexico Prove Key to Project

机译:墨西哥湾的经验和成功证明了项目的关键

获取原文
获取原文并翻译 | 示例
           

摘要

Halliburton Energy Services drew upon its longtime experience in the Gulf of Mexico and its expertise in cementing, perforation and well stimulation for Devils Tower project. Halliburton Energy Services' (HES) cementing services provided zonal isolation to prevent fluid movement between formations, ensure a bond to provide support for the casing and provide wellbore reliability. "WellLife cement modeling enhances the design of fit-for-purpose slurries used in the deepwater area," said Kerry Steele, technical advisor in the cementing group. "WellLife modeling was relatively new at the beginning of the Devils Tower project, and it gave us a basic idea of how the cement properties will react over the life of the well. Since Devils Tower, it's been used more often with great success." HES' cementing unit was on the Marianas and the Max Smith drilling rigs chosen for this project. "Seven of the eight Devils Tower wells have been completed, and Dominion has not had to perform any remedial cementing or block squeezes of any of the productive zones to date - definitely a cost-saving measure," Steele said.
机译:哈里伯顿能源服务公司利用其在墨西哥湾的长期经验以及在恶魔塔项目的固井,射孔和增产方面的专业知识。哈里伯顿能源服务公司(HES)的固井服务提供了区域隔离,以防止地层之间的流体运动,确保粘结以为套管提供支撑并提供井眼可靠性。固井技术顾问凯里·斯蒂尔说:“ WellLife水泥建模可以增强深水区使用的专用泥浆的设计。” “ WellLife建模在Devils Tower项目开始之初是相对较新的,它为我们提供了水泥特性在井的使用寿命中如何反应的基本概念。自Devils Tower开始,它被更广泛地使用,并取得了巨大的成功。” HES的固井设备位于为该项目选择的Marianas和Max Smith钻机上。斯蒂尔说:“八座魔鬼塔井中的七口已经完工,迄今为止,Dominion不必对任何一个生产区进行任何补救性固井或压挤,这绝对是一种节省成本的措施。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号