Development of dynamic planning and control methodology (DPM): based on the user-defined dynamic modeling approach

机译:动态规划和控制方法论(DPM)的开发:基于用户定义的动态建模方法

获取原文
获取原文并翻译 | 示例
           

摘要

CPM-based scheduling methods have been most widely used in the planning and control of construction projects. However, their usefulness has been often questioned, particularly when a project is heavily constrained by either time or resources. This is mainly because those CPM-based methods lack the mechanism to effectively formulate construction plans and evaluate feedback effects on the construction performance. As an effort to address this issue, the Dynamic Planning and Control Methodology (DPM) has been developed by integrating the CPM-based network scheduling concept and the simulation approach. To be used as a standalone planning and control tool, DPM adopts the user-defied dynamic modeling approach, which allows construction planners to define contents of pre-structured models by setting the values of model parameters. Having the ability to simulate the dynamic state of construction with the required flexibility, DPM aims to help prepare a robust construction plan against uncertainties. Particularly, DPM focuses on construction feedbacks in dealing with indirect and unanticipated events that might occur during construction. As examined in a case study with bridge construction projects, the use of DPM would help ensure that construction projects could be delivered in time without driving up costs by enhancing planning and control capabilities.
机译:基于CPM的计划方法已最广泛地用于建筑项目的计划和控制中。但是,它们的实用性经常受到质疑,特别是当一个项目受到时间或资源的严重限制时。这主要是因为那些基于CPM的方法缺乏有效地制定施工计划并评估对施工性能的反馈效果的机制。为了解决此问题,已经通过集成基于CPM的网络调度概念和模拟方法来开发动态规划和控制方法(DPM)。为了用作独立的计划和控制工具,DPM采用了用户定义的动态建模方法,该方法允许建筑规划人员通过设置模型参数的值来定义预构建模型的内容。 DPM能够以所需的灵活性模拟建筑的动态状态,旨在帮助制定可靠的建筑计划以应对不确定性。特别是,DPM在处理施工期间可能发生的间接和意外事件时,将重点放在施工反馈上。正如在桥梁建设项目的案例研究中所检查的那样,DPM的使用将有助于确保建设项目能够按时交付,而不会通过增强计划和控制能力而增加成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号