Finite element analysis of residual stresses in a letter-box excavation repair weld for Chapelcross Power Station

机译:Chapelcross电站信箱开挖修复焊缝中残余应力的有限元分析

获取原文
获取原文并翻译 | 示例
           

摘要

A routine inspection on the heat exchanger 6 boiler in Chapelcross Nuclear Power Station revealed the existence of a crack in the bottom dome of the boiler. A 'letter-box' repair procedure was developed to repair the damage and justify the return to service of the boiler. Due to the location of the repair, it was undesirable to conduct post weld heat treatment (PWHT) because this could result in damage to neighbouring components. A full residual stress programme was conducted in order to justify a non-PWHT repair to the boiler using a temper bead technique on a boiler shell section of up to 44 mm. This paper describes the work conducted during the project and subsequently regarding residual stresses in letterbox excavation repairs.
机译:在Chapelcross核电站的6号换热器锅炉的例行检查中,发现锅炉底部圆顶存在裂纹。制定了“信箱”维修程序,以修复损坏并证明锅炉可以重新使用。由于维修地点的原因,不希望进行焊后热处理(PWHT),因为这可能会损坏相邻的零件。为了在不超过44 mm的锅炉壳体截面上使用回火珠技术对锅炉进行非PWHT维修,进行了完整的残余应力程序。本文介绍了在项目期间进行的工作,以及随后有关信箱开挖维修中的残余应力的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号