Scheduling new product development projects using simulation-based dependency structure matrix

机译:使用基于仿真的依赖结构矩阵安排新产品开发项目的进度

获取原文
获取原文并翻译 | 示例
           

摘要

On the whole, appropriate scheduling is an extremely paramount factor in project planning. It makes planning items such as allocating resource, determining the number of contractors, maintaining, and delivering order easy. Due to its convoluted nature, scheduling new product development projects is very difficu managers of these projects deal with complicated factors like uncertain activity duration, information flow and complex relationships. Dependency structure matrix (DSM) has been suggested to cope with these complexities. In the present study, uncertainty in estimating project duration is highlighted; therefore, input information like activity duration, information flow among activities, and the time factors are considered stochastic. Firstly, random numbers are generated based on probability distribution of inputs. Then, project duration and minimised project duration are simulated using DSM method and Monte-Carlo simulation; when simulation turns stable, the mean and variance of durations are obtained. A numerical example is provided and findings are discussed.
机译:总体而言,适当的计划安排是项目计划中极为重要的因素。它使计划项目(例如分配资源,确定承包商数量,维护和交付订单)变得容易。由于其复杂性,安排新产品开发项目非常困难;这些项目的经理处理复杂的因素,例如不确定的活动持续时间,信息流和复杂的关系。已经提出依赖结构矩阵(DSM)来应对这些复杂性。在本研究中,突出了估计项目工期的不确定性。因此,输入信息(例如活动持续时间,活动之间的信息流和时间因素)被认为是随机的。首先,根据输入的概率分布生成随机数。然后,使用DSM方法和蒙特卡洛模拟来模拟项目工期和最小化的项目工期。当模拟变得稳定时,将获得持续时间的均值和方差。提供了一个数值示例并讨论了发现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号