...
【24h】

Requirements for a tidal power demonstration scheme

机译:Requirements for a tidal power demonstration scheme

获取原文
获取原文并翻译 | 示例
           

摘要

If in the future it is decided to progress the British tidal power programme, the next logical step will be to build a demonstration scheme. Criteria for selecting a suitable demonstration scheme site are set out and a number of candidatesidentified, making use of a survey of small estuaries carried out by Binnie and Partners in 1986. These candidates are compared in the light of the information they are likely to produce and of the probable investment required.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号