Perenco Brazil said that hook-up of the FSO vessel for the Pargo project in the Campos Basin is complete.The hook-up included the connection of nine mooring lines and the new production line from the Pargo platform,Petrobras announced.The lines will connect to the new turret,which was integrated in Dubai as a key part of the FSO conversion.The FSO PARGO,which has 750,000 bbl of storage capacity,will serve the Pargo Cluster offshore Brazil.
展开▼