首页> 外文期刊>Progress in nuclear engergy >Uncertainty analysis of HPR-1000 LOCA with probabilistic and deterministic methods
【24h】

Uncertainty analysis of HPR-1000 LOCA with probabilistic and deterministic methods

机译:Uncertainty analysis of HPR-1000 LOCA with probabilistic and deterministic methods

获取原文
获取原文并翻译 | 示例
           

摘要

The HPR-1000 is an advanced Gen Ⅲ pressurized water reactor (PWR) in China. For the purpose of carrying out uncertainty analysis of the LOCA scenario, two different types of best estimate plus uncertainty (BEPU) method were utilized, namely the DRM of the deterministic method and a typical input-driven probabilistic method. The DRM is carried out by introducing a penalization mode to envelop the input uncertainties, while the probabilistic input-driven method is implemented by performing the uncertainty propagation after the uncertainty sources are identified and quantified. The peak cladding temperature (PCT) was selected to be the figure of merit, and the 95% confidence limit as well as the tolerance limit of the PCT in the LOCA scenario were obtained. Results show that even though there are some phenomenal differences exist, the uncertainty limit obtained through the two methods are similar and both fall below the acceptance criterion.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号