...
首页> 外文期刊>Australia's Paydirt >Out with the old for Blackthorn
【24h】

Out with the old for Blackthorn

机译:与老去黑刺

获取原文
获取原文并翻译 | 示例
           

摘要

Blackthorn Resources Ltd will retake the initiative at the Mumbwa copper project in Zambia after BHP Billiton Ltd announced it would be exiting the project. The two companies have participated in various JV incarnations over Mumbwa -150km north-west of the Zambian capital of Lusaka - since 2004 with BHP Billiton having funded the most recent activity as part of a clawback of 80% of the project. That period has seen BHP Billiton fund more than 20,000m of drilling on the project. Blackthorn was to continue to be free-carried through to a BFS but BHP Billiton's withdrawal will see the project revert 100% to Sydney-based Blackthorn. Blackthorn managing director Scott Lowe told Paydirt it had come as no surprise that the major had decided to walk away.
机译:在必和必拓公司宣布将退出该项目后,Blackthorn Resources Ltd将在赞比亚的Mumbwa铜项目中重新采取主动。自2004年以来,这两家公司参与了赞比亚首都卢萨卡西北方150公里处的姆姆布瓦地区的各种合资经营活动,必和必拓为此项目的80%的回扣提供了最新的资金。那个时期,必和必拓为该项目提供了超过200亿钻探的资金。 Blackthorn原本将继续免费运送到BFS,但必和必拓的撤出将使该项目100%恢复为总部位于悉尼的Blackthorn。布莱克索恩(Blackthorn)董事总经理斯科特·洛(Scott Lowe)告诉佩迪尔特(Padirdirt),少校决定走开并不奇怪。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号