Sydney's Cross City Tunnel Adopts New Reinforcing Solutions

机译:悉尼克罗斯城隧道采用新的加固解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Have you ever tried to build a concrete slab upside down? Start with a surface six to seven metres above your head. Then hang the loose reinforcing steel and bar chairs below this surface. Finally suspend the formwork below the reinforcement and pump concrete into the space between the formwork and overhead surface, remembering that air trapped against the overhead surface needs to be removed. Sound difficult? Well that is how a concrete lined tunnel is placed. The Baulderstone Hornibrook Bilfinger Berger Joint Venture (BHBB JV) approached Smorgon Steel Reinforcing for an easier way of placing the tunnel reinforcement at the Cross City Tunnel. The solution provided by Smorgon Steel Reinforcing was simple; two cages of reinforcing steel, fabricated off-site, to create an arch across the roof of the tunnel.
机译:您是否曾经尝试过颠倒地建造混凝土板?从头顶六到七米的表面开始。然后将松散的钢筋和吧椅悬挂在该表面下。最后,将模板悬挂在钢筋下方,并将混凝土泵入模板和高架表面之间的空间,并记住需要清除滞留在高架表面上的空气。听起来很难?嗯,这就是放置混凝土衬砌隧道的方式。鲍德斯通·霍尼布鲁克·比尔芬格·伯杰(BHBB JV)合资企业与Smorgon钢铁加固公司联系,以寻求更简便的方法将隧道加固物放置在克罗斯城隧道内。 Smorgon Steel Reinforcing提供的解决方案很简单;在现场制造的两个钢筋笼,在隧道顶上形成一个拱形。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号