...
首页> 外文期刊>Inside FERC >4th Circuit invalidates West Virginia water permit for Mountain Valley gas pipe
【24h】

4th Circuit invalidates West Virginia water permit for Mountain Valley gas pipe

机译:4th Circuit invalidates West Virginia water permit for Mountain Valley gas pipe

获取原文
获取原文并翻译 | 示例
           

摘要

In a decision that could slow the completion of the MountainValley Pipeline, the US Court of Appeals for the 4th Circuit struckthe water quality certification that West Virginia regulators issuedfor the natural gas project.The 304-mile, 2 Bcf/d project, connecting Appalachian Basingas to downstream markets, is partially constructed but hasbeen long-delayed amid multiple legal challenges to its federalauthorizations and repeated adverse rulings by the federalappeals court.

著录项

  • 来源
    《Inside FERC》 |2023年第6期|1-20|共3页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号