...
首页> 外文期刊>Geomechanik und tunnelbau >Rail‐bound logistics in tunnelling – Challenging logistics for a 30 km long TBM drive
【24h】

Rail‐bound logistics in tunnelling – Challenging logistics for a 30 km long TBM drive

机译:隧道掘进中的铁路物流 – 30公里长的隧道掘进机掘进的具有挑战性的物流

获取原文
获取原文并翻译 | 示例
           

摘要

Abstract During the early years of the 19th century, narrow‐gauge railways found their way into mines and tunnel projects. Due to economic reasons, these rail‐bound transport systems were successfully used for the transport of personnel, supplies and muck operations. While the worldwide transport logistics developed and changed continuously over the following century, there was limited demand within the tunnelling industry on innovation and improvement for these robust, durable and simple railways. Moreover, rubber‐tired transport systems were introduced to the market and replaced traditional rail equipment on many tunnelling projects. The MTS tunnel Drive 1, originally planned to be 13 km in length and now extended to 30 km, will become the longest single tunnel drive in the world, demonstrating the flexibility of a rail‐bound system. Since the start of the project, various suppliers and manufacturers for rail‐bound equipment and rail track systems have been involved in the development of innovative drive systems, under‐carriages and rail tracks. This article provides an overview of the design, implementation and lessons learned so far.
机译:在19世纪早期的抽象世纪,狭窄的衡量铁路找到了在矿山和隧道项目。地理原因,这些铁路运输系统成功地用于运输人员,神气活现的供应和操作。运输物流发展和改变不断在接下来的世纪在隧道行业是有限的需求为这些健壮的创新和改进,耐用的和简单的铁路。介绍了橡胶疲劳应承担运输系统市场,取代了传统的铁路设备在许多隧道项目。隧道开1,原计划是13公里长度,现在扩展到30公里,将成为世界上最长的隧道单驱动,展示一个铁路的灵活性系统。供应商和制造商的铁路列车设备和轨道系统参与创新驱动的发展系统,在列车车厢和铁轨。文章概述了设计,实现和到目前为止的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号