...
首页> 外文期刊>Water & wastewater treatment: WWT Ireland >Enso flying high with installation
【24h】

Enso flying high with installation

机译:Enso高飞与安装

获取原文
获取原文并翻译 | 示例
           

摘要

When Flybe decided to build a brand new Training Academy at Exeter Airport there were a number of sewage and wastewater challenges that, combined with significant environmental considerations, had to be met and overcome. To process the estimated 32m3/d of sewage, Flybe called upon EnSo International to provide it with a treatment plant to meet the strict Environment Agency specifications and work within the space constraints that the site presented. As part of their bespoke solutions approach, EnSo discussed a number of factors with Flybe before putting forward its tailored proposal. With the site being located next to the airport, space was at a premium and the site is in an area of low alkalinity which needed to be addressed for the discharge consents to be met.
机译:当Flybe决定建立一个全新的培训埃克塞特学院在机场有许多污水和废水的挑战,总和与重大环境因素、必须认识并克服。估计32 m3 / d的污水,Flybe呼吁EnSo国际提供治疗工厂以满足严格的环境机构规范和工作空间网站提供的约束。他们的定制解决方案的方法,EnSo讨论许多因素与Flybe之前提出其定制的建议。在位于机场旁边,在一个空间优质的网站是在一个地区低碱度的需要解决放电同意。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号