...
首页> 外文期刊>World Oil >Hybrid completion method employed for longest horizontal unconventional well in Argentina
【24h】

Hybrid completion method employed for longest horizontal unconventional well in Argentina

机译:在阿根廷的最长水平非传统良好的混合完成方法

获取原文
获取原文并翻译 | 示例
           

摘要

The vast shale oil and gas resources of Argentina's Vaca Muerta formation in the Neuquen basin were first tapped in 2010. Since then, operators have been trying to increase production while reducing well costs. They have experimented with both vertically and horizontally oriented wellbores, hydraulic fracturing, increased wellbore segmentation, and various completion techniques.
机译:2010年,阿根廷新昆盆地Vaca Muerta组的巨大页岩油气资源首次被开采。从那时起,运营商一直在努力提高产量,同时降低油井成本。他们试验了垂直和水平定向井筒、水力压裂、增加井筒分段和各种完井技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号