首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Angola pre-salt hiccups for Total and Statoil
【24h】

Angola pre-salt hiccups for Total and Statoil

机译:安哥拉对Total和Statoil的盐下打ic

获取原文
获取原文并翻译 | 示例
           

摘要

Multi-well pre-salt drilling programmes for Total and Slatoil oJT Angola will have to wait until the next year following rig delays. The French operator had been hoping to lake the newbuild Ocean Rig drillship Skyros last month for a 275-day US $190m programme. Last week Ocean Rig said delivery had now been delayed until January "due to the late delivery of third parly and subsupplier equipment".
机译:Total和Slatoil oJT Angola的多井预盐钻探计划将不得不等到钻机延期到明年。这位法国运营商一直希望在上个月为这艘新造的“海洋钻机”(Ocean Rig)钻井船“天罗斯”号(Skyros)停泊,进行为期275天,耗资1.9亿美元的计划。上周,海洋钻机公司表示,由于“延迟交付”第三部分和次级供应商的设备,交货时间现已推迟至1月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号