By 2018, Com Ed will have installed 4 million smart meters and 5,300 distribution automation devices in northern Illinois. Up until six years ago, ComEd was operating an analog grid in a digital age. Once the utility secured funding for grid modernization, it began installing smart meters and accelerated attaching distribution automation devices to poles and upgrading underground and overhead infrastructure. The utility first started its smart grid journey in 2009 by installing 130,000 smart meters as a pilot project in its Maywood operating area. Two years later, the Energy Infrastructure Modernization Act (EIMA) authorized $2.6 billion in grid modernization with half of the funding directed toward infrastructure improvements and the remainder allocated to smart grid investments such as installing smart meters and smart switches and modernizing substations.
机译:到2018年,COM ED将在伊利诺利亚州北部的400万智能电表和5,300个分销自动化设备上安装。 直到六年前,编剧是在数字时代的模拟网格。 一旦该实用程序获得了网格现代化的资金,它开始安装智能电表并加速将配送自动化设备加速到杆,升级地下和架空基础架构。 该实用程序首先在2009年首次安装了130,000级智能电表作为梅尔伍德运营区的试点项目。 两年后,能源基础设施现代化法案(EIMA)授权26亿美元的网格现代化,其中一半的资金针对基础设施改进,其余部分分配给智能电网投资,如安装智能电表和智能开关和现代化变电站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号