...
首页> 外文期刊>Timber Processing >Getting Up To Speed
【24h】

Getting Up To Speed

机译:加快速度

获取原文
获取原文并翻译 | 示例
           

摘要

TROY, Ala.Rex Lumber is pushing hard toward production capacity at its new southern yellow pine sawmill here. Given the amazing hike in lumber prices over the summer, the mill is finding its footing at the right time.General Manager Jason Gulledge will be the first to tell you the mill has another 20% or so to go, and they've encountered a few hurdles along the way, but nobody seems to be complaining.Troy is Rex Lumber's (and the McRae family's) fourth sawmill, in addition to SYP mills at Graceville and Bristol, Fla. and Brookhaven, Miss. Once Troy reaches its goal of 300MMBF annual production, Rex Lumber will be flirting with 1 billion BF of combined annual output.Rex Lumber has always been recognized for its modern sawmills and regularly upgrading them with the newest technology. It has also specialized in tearing down old mills and building new ones on site, but management felt the time was right for a greenfield sawmill. "Build new and do it the way we wanted," Gulledge comments, adding that management started kicking it around even before the last presidential election and gave serious consideration to locating in Arkansas.
机译:Troy,Ala.rex木材正在推动其新的南部黄松锯木厂的生产能力。鉴于夏天的木材价格上的惊人徒步旅行,磨机在正确的时间内找到了脚踏实际。杰森·格尔奇将是第一个告诉你磨机的20%左右,他们遇到了一个沿途很少有障碍,但没有人似乎是抱怨。如果在格雷斯维尔和布里斯托尔,弗拉斯的Syp厂房除了Syp Mills之外,还没有人抱怨。和布鲁克·弗伦,小姐。一旦特洛伊达到了300mmbf的目标年产量,雷克斯木材将在10亿BF中调情,综合年产量。钢材始终以现代锯木厂认可,并定期与最新技术升级。它还专注于拆除旧工厂并在现场建立新的磨坊,但管理层感受到了绿地锯木厂的时间是正确的。 “建立新的并以我们想要的方式做到这一点,”Gulldedge评论,增加了管理层即使在最后的总统选举之前也开始踢它,并认真考虑在阿肯色州定位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号