...
首页> 外文期刊>Modeling Earth Systems and Environment >Cut soil slope stability analysis along National Highway at Wozeka–Gidole Road, Ethiopia
【24h】

Cut soil slope stability analysis along National Highway at Wozeka–Gidole Road, Ethiopia

机译:埃塞俄比亚Wozeka-Gidole Road国家公路削减土壤边坡稳定性分析

获取原文
获取原文并翻译 | 示例
           

摘要

The Wozeka–Gidole road in Ethiopia experiences frequent slope failure and triggered during road construction. This study identified the actually failed slope to verify numerical results of both limit equilibrium method (LEM) and finite element method (FEM) with the actually failed slope. Modeling of the actually failed slope with the FEM-based PLAXIS software and LEM-based SLOPE/W software had been used to calculate the factor of safety (FOS). The comparative study of the LE methods shows that The Bishop, Janbu, Morgenstern-Price, GLE and Spencer methods yield in most cases identical FOS for circular slip surface. However, the ordinary method may underestimate the FOS. All LE methods, except the Ordinary methods, estimate higher FOS than FE analysis in PLAXIS. Numerical results of both FEM and LEM verify instability of the slope. In general, the model provides the possible major causes of slope instability and their possible remedial measures in the study area.
机译:埃塞俄比亚的WOZEKA-GIDOLE道路经历了频繁的斜坡故障并在道路建设期间触发。 本研究确定了实际失败的斜率,以验证限制平衡方法(LEM)和有限元方法(FEM)的数值结果,实际上失败的斜率。 使用基于FEM的PLAXIS软件和基于LEM的斜率/ W软件的实际失败的斜率建模已被用于计算安全因子(FOS)。 LE方法的比较研究表明,主教,JanBu,Morgenstern-Price,GLE和Spencer方法在大多数情况下产生圆形滑动表面的相同FOS。 然而,普通方法可能低估FOS。 除普通方法外,所有LE方法,估计在PLAXIS中的FE分析比FE分析更高。 FEM和LEM的数值结果验证斜坡的不稳定性。 通常,该模型提供了坡度不稳定的可能主要原因及研究区可能的补救措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号