首页> 外文期刊>Advanced Composites Bulletin >CFM begins LEAP-1B engine ground testing
【24h】

CFM begins LEAP-1B engine ground testing

机译:CFM开始进行LEAP-1B发动机地面测试

获取原文
获取原文并翻译 | 示例
           

摘要

CFM International has started ground testing of the first LEAP-IB engine at Snecma (Safran) facilities in Villaroche, France. The testing is the first step of a two-year programme that will culminate in engine certification in 2016 and entry into commercial service on the Boeing 737 MAX airplane in 2017. The LEAP-IB engine, which is the exclusive power-plant for the 737 MAX family, fired for the first time on 13 June 2014, three days ahead of the schedule set when the programme was launched in 2011. After a series of break-in runs, the engine has been operating smoothly and has reached full take-off thrust.
机译:CFM International已开始在法国Villaroche的Snecma(Safran)工厂对第一台LEAP-IB发动机进行地面测试。该测试是一项为期两年的计划的第一步,该计划将在2016年获得引擎认证,并于2017年在波音737 MAX飞机上投入商业服务。LEAP-IB引擎是737的独家动力装置MAX系列于2014年6月13日首次点火,比计划于2011年启动的时间表提前了三天。经过一系列磨合运行后,发动机运转平稳,并已完全起飞推力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号