...
首页> 外文期刊>SBB Steel Markets Daily >AM to restart blast furnace at Fos sur Mer while working on Ghent reline
【24h】

AM to restart blast furnace at Fos sur Mer while working on Ghent reline

机译:我正在重新开始在根特罗内重启Fos Sur Mer的高炉

获取原文
获取原文并翻译 | 示例
           

摘要

London—ArcelorMittal will restart its No. 1 blast furnace at Fos-sur-Mer in France in mid-September, a company spokesman told S&P Global Platts on Sept. 2. The leading steelmaker decided to blow in the BF to rebalance its crude steel output after starting a reline of one of its two BFs in Ghent, Belgium. “That reline starts this week,” the spokesman told Platts. Ghent last year produced 5.5 million mt of crude steel. ArcelorMittal idled the No.1 BF at Fos-sur-Mer on March 23 due to the coronavirus outbreak, as reported by Platts. ArcelorMittal has two BFs at Fos-sur-Mer with a combined design capacity for 4 million mt a year of crude steel. ArcelorMittal intended to temporarily shut the No. 2 BF at Fos-sur-Mer due to a lack of orders last month, but then decided to keep it in operation.
机译:一家公司发言人在9月中旬,伦敦 - arcelormittal将于9月中旬在法国的FOS-Sur-Mer排名第1型高炉,一家公司发言人在9月2日告诉标准普尔全球普拉特。领先的钢铁制造商决定在BF中吹重平衡钢材 在比利时跟根特的两个BFS之一开始的Reline输出。 “这对Reline本周开始,”发言人告诉普拉特。 去年根特生成550万吨粗钢。 ArcelorMittal于3月23日在普罗斯冠军爆发的情况下闲置了Fos-Sur-Mer的No.1 BF。 ArcelorMittal在FOS-SUR-MER中有两台BFS,粗钢一年的400万MT的设计能力为400万吨。 由于上个月缺乏订单,ArcelorMittal旨在暂时关闭FOS-SUR-MER的第2 BF,但是决定将其保持在运营中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号