首页> 外文期刊>International Oil Daily >Lundin Spuds Malaysia Well
【24h】

Lundin Spuds Malaysia Well

机译:Lundin钉马来西亚井

获取原文
获取原文并翻译 | 示例
           

摘要

Sweden's Lundin Petroleum has spudded the Batu Hitam-1 well offshore peninsular Malaysia. The well, in Block PM308A, is the third it has drilled in the country this year, following two successful wildcats offshore Sabah (IOD Aug.5'11). Batu Hitam-1 will test the hydrocarbon potential of a large basement high structure in the eastern part of the block. The objectives are Oligocene sandstones in a four-way dip closure and fractured pre-Tertiary basement in the underlying horst block. The planned total depth is 2,450 meters subsea; the well will be drilled using the Offshore Courageous jack-up rig.
机译:瑞典的隆丁石油公司(Lundin Petroleum)在马来西亚半岛近海的黑风Hit淡水1(Batu Hitam-1)井上开钻。继在沙巴近海成功捕捞了两只野猫(IOD,2011年8月5日)之后,该井位于PM308A区块,是该国今年在该国钻的第三口井。 Batu Hitam-1将测试该区块东部大型地下室高层结构的碳氢化合物潜力。目的是四向倾角封闭中的渐新世砂岩和下伏的地块中的第三纪前基底破裂。计划的总深度为海底2,450米;该井将使用Offshore Courageous自升式钻井平台进行钻探。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号