首页> 外文期刊>耐火物 >Development of Optimum Operation Method for Tank on LNG Receiving Terminal
【24h】

Development of Optimum Operation Method for Tank on LNG Receiving Terminal

机译:LNG接收站储罐最佳运行方法的研制

获取原文
获取原文并翻译 | 示例
           

摘要

We developed optimization providing efficient tank operation guidance on LNG receiving from cargo ships and on discharge consumption demand for LNG storage tanks at the Nihonkai LNG Co., Ltd., Niigata Receiving Terminal. The storage tank level has been suitably maintained and operation cost cut. Dynamic programming (DP) is applied to solve the optimization problem in 3 steps, greatly reducing calculation time. This system enables us to estimate long-term scheduling and is used for operator guidance and operations planning.
机译:在新泻接收站日本海液化天然气有限公司,我们开发了优化方案,为从货船接收液化天然气和液化天然气储罐的排放消耗需求提供了有效的储罐操作指导。储罐高度已得到适当维护,降低了运营成本。采用动态规划(DP)可以分三步解决优化问题,从而大大减少了计算时间。该系统使我们能够估计长期调度,并用于操作员指导和操作计划。

著录项

  • 来源
    《耐火物》 |1985年第2期|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 jpn
  • 中图分类 耐火材料工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号