首页> 外文期刊>CompressorTech Two: Dedicated to Gas Compression Products and Applications >CNG Transport System Becomes Virtual Pipeline: OsComp technology captures flare gas for drilling, fracturing
【24h】

CNG Transport System Becomes Virtual Pipeline: OsComp technology captures flare gas for drilling, fracturing

机译:CNG运输系统成为虚拟管道:OsComp技术捕获火炬气以进行钻井,压裂

获取原文
获取原文并翻译 | 示例
           

摘要

Physical pipelines are expensive and time-consuming to build. Barriers to acquiring rights-of-way and securing necessary permits and approvals can even prevent them from being built at all. Consequently, many prospective users do not have access to natural gas even though supplies are very plentiful. Even where plans exist to build pipelines, access to them may take years.
机译:物理管道昂贵且耗时。获得通行权并获得必要的许可和批准的障碍甚至可能完全阻止建立它们。因此,即使供应非常丰富,许多潜在用户也无法获得天然气。即使存在建立管道的计划,也要花费数年的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号