首页> 外文期刊>Drilling Contractor >Well control risks on HPHT wells may call for system upgrades--Enhanced kick detection, management systems and crew training may be required to maximize safety
【24h】

Well control risks on HPHT wells may call for system upgrades--Enhanced kick detection, management systems and crew training may be required to maximize safety

机译:HPHT井的井控风险可能需要系统升级-可能需要增强的反冲检测,管理系统和人员培训,以最大限度地提高安全性

获取原文
获取原文并翻译 | 示例
           

摘要

High-pressure, high-temperature (HPHT) wells are defined differently throughout the industry. The UK Energy Institute's Model Code of Safe Practice in the Petroleum Industry defines HPHT wells as "where undisturbed bottomhole temperature exceeds 300°F (149°C) and where mud weight in excess of 15.4 ppg is needed, or where pressure-control equipment over 10,000 psi is needed."The API does not yet specifically rule on HPHT wells and drilling, although changes in API specifications and recommended practices are anticipated.
机译:整个行业对高压高温(HPHT)井的定义有所不同。英国能源研究所的《石油行业安全操作标准范本》将HPHT井定义为“井底温度不受干扰的温度超过300°F(149°C),需要泥浆重量超过15.4 ppg,或压力控制设备超过需要达到10,000 psi。”尽管API规格和建议的操作方法有所变化,但API尚未明确规定对HPHT井和钻井进行控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号