Drilling Past the Limits

机译:超越极限

获取原文
获取原文并翻译 | 示例
       

摘要

PowerSouth encountered significant challenges during its underground cable project that required unique solutions. PowerSouth Energy Cooperative needed a new 300-MVA, 115-kV transmission line to feed Orange Beach, Alabama, U.S. The new line also could be a networked line serving several other substations in south Baldwin County, an area served by Baldwin EMC. Approximately 5 miles (8 km) of the new transmission line was typical overhead construction designed for a Gulf of Mexico coastal environment. However, approximately 6,500 ft (2 km) of this new transmission line had to be installed under the Intracoastal Waterway, Wolf Bay, Alabama Highway 180 and PowerSouth's energized 115-kV Florida Avenue substation.
机译:PowerSouth在其地下电缆项目中遇到了需要独特解决方案的重大挑战。 PowerSouth Energy Cooperative需要一条新的300 MVA,115 kV输电线路来为美国阿拉巴马州的奥兰治比奇供电。新线路还可能是为鲍德温县南部的其他几个变电站提供服务的联网线路,该地区由鲍德温EMC服务。新传输线约5英里(8公里)是专为墨西哥湾沿海环境设计的典型架空建筑。但是,必须在内陆水路,沃尔夫湾,阿拉巴马州180号公路和PowerSouth通电的115 kV佛罗里达大道变电站下安装约6500英尺(2公里)的新输电线路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号