首页> 外文期刊>The International Journal of Advanced Manufacturing Technology >A constructive heuristic for the integrated scheduling of machines and multiple-load material handling equipment in job shops
【24h】

A constructive heuristic for the integrated scheduling of machines and multiple-load material handling equipment in job shops

机译:建设性的启发式方法,用于作业车间中的机器和多物料搬运设备的集成调度

获取原文
获取原文并翻译 | 示例
           

摘要

This paper extends the traditional job shop scheduling problem (JSP) by incorporating the routing and scheduling decisions of the material handling equipment. It provides a generic definition and a mixed integer linear programming model for the problem considering the case of heterogeneous multiple-load material handling equipment. A constructive heuristic is developed for solving the problem. This heuristic is based on the well-known Giffler and Thompson's algorithm for the JSP with modifications that account for the routing decisions of the material handling equipment and their effect on the start times of the manufacturing operations. Different dispatching rules are integrated into the heuristic, and experiments are conducted to study their effect on the makespan along with the determination of the computational time requirements of the developed heuristic.
机译:本文通过合并物料搬运设备的工艺路线和调度决策,扩展了传统的作业车间调度问题(JSP)。考虑到异构多负荷物料搬运设备的情况,它为问题提供了通用定义和混合整数线性规划模型。开发了一种建设性的启发式方法来解决该问题。此启发式方法基于著名的Jiff的Giffler和Thompson的JSP算法,并进行了修改,以说明物料搬运设备的工艺路线决策及其对制造操作开始时间的影响。将不同的调度规则集成到启发式方法中,并进行实验以研究其对有效期的影响,并确定已开发的启发式方法的计算时间要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号