...
首页> 外文期刊>Wired >REBUILD THE BRIDGE — AGAIN
【24h】

REBUILD THE BRIDGE — AGAIN

机译:重新建造桥梁-再次

获取原文
获取原文并翻译 | 示例
           

摘要

IN 1904, a group of Canadian workers began the hard slog of constructing the world's longest bridge, across the Saint Lawrence River just south of the city of Quebec. It was a wildly ambitious project. And it wasn't just for the Quebecois: Railroads were revolutionizing commerce and communications, and the bridge would connect people and allow trains to run from New Brunswick in the east to Winnipeg in the west. The river was 190 feet deep at the center, and ice piled high above the water's surface in the winter. Nothing about the bridge's construction would be easy. The engineers chose a complex cantilever design, a cutting-edge approach but a cost-efficient one too. Ambition creates risks, and warning signs started to appear. The steel trusses weighed more than expected. Some of the lower chords of the bridge seemed misaligned or bent. Workers raised concerns. But the project's leaders pressed ahead.
机译:1904年,一群加拿大工人开始艰苦奋斗,在魁北克市以南的圣劳伦斯河上建造世界上最长的桥梁。这是一个野心勃勃的项目。这不仅适用于魁北克:铁路正在彻底改变商业和通讯业,桥梁将人们连接起来,并允许火车从东部的新不伦瑞克(New Brunswick)到西部的温尼伯(Winnipeg)。这条河的中心深度为190英尺,在冬天,冰堆积在水面以上。这座桥的建造绝非易事。工程师们选择了一种复杂的悬臂设计,一种先进的方法,但也选择了一种具有成本效益的方法。野心带来风险,警告标志开始出现。钢桁架的重量超过了预期。桥的一些下弦似乎未对准或弯曲。工人们提出了担忧。但是该项目的负责人向前推进。

著录项

  • 来源
    《Wired》 |2019年第11期|40-404244|共3页
  • 作者

    NICHOLAS THOMPSON;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号