The Loddon Sewer Rehabilitation scheme for Anglian Water was designed to enable the repair of a 300mm diameter rising main that had experienced multiple bursts. The client engaged water and wastewater specialists Onsite to quickly assess the site and provide a suitable solution. One major complication for the completion of the proposed rehabilitation was that part of the route of the rising main ran through a site of special scientific interest (SSSI). This meant that an open cut solution could not even be considered. Furthermore, access to the pipeline was difficult. A site meeting was arranged with the client Anglian Water, Onsite and Claret Civil Engineering (the civils contractor) to discuss available options and to target the problematic areas of the route.
展开▼