首页> 外文期刊>WaterShapes >Hillside Smarts
【24h】

Hillside Smarts

机译:山坡聪明人

获取原文
获取原文并翻译 | 示例
           

摘要

In last month's introduction to what it takes to prepare for, organize and complete the excavation stage of the watershape-construction process, basic common sense was the governing factor in how the process should proceed. What I was discussing last time, however, was simple, flat-site excavations - cases in which access is commonly not an issue, soils are often consistent across a site and the potential surprises are relatively few.
机译:在上个月的水形施工过程的准备,组织和完成挖掘阶段的简介中,基本常识是该过程应如何进行的决定性因素。但是,我上次讨论的是简单的,平坦的开挖-在通常情况下进出不成问题的情况下,整个站点的土壤通常是一致的,潜在的意外事件相对较少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号