首页> 外文期刊>Water Science and Technology >London Tideway Tunnels: tackling London’s Victorian legacy of combined sewer overflows
【24h】

London Tideway Tunnels: tackling London’s Victorian legacy of combined sewer overflows

机译:伦敦潮道隧道:解决伦敦维多利亚时代下水道合并溢流的遗留问题

获取原文
获取原文并翻译 | 示例
           

摘要

It takes a few millimetres of rainfall to cause the 34 most polluting combined sewer overflowsn(CSOs) to discharge into the River Thames. Currently, in a typical year, spillages to the tidalnreaches of the River Thames occur about 60 times, with an estimated spill volume of 39 millionncubic metres. Both the UK Government and the European Union have determined that the CSOndischarges have an adverse environmental impact on fish species, introduce unacceptablenaesthetics and elevate the health risks for recreational users of the Thames, with a frequency ofndischarge which is in breach of the Urban Wastewater Treatment Directive. Studies havenestablished that the environmental objectives can be fully met on the most cost-effective basis byncompleting both quality improvements to treatment works and by the provision of a storage andntransfer tunnel to intercept unsatisfactory CSOs. Extensive modelling has been undertaken tondevelop an optimised solution. In parallel with the design development a rigorous andncomprehensive site selection methodology has been established to select sites and consultnstakeholders and the public on the preferred sites and scheme, with the first stage of publicnconsultation planned for later in 2010. The London Tideway Tunnels are an essential part of thendelivery of improvements to the water quality of the tidal River Thames, and this ambitious,nhistoric scheme represents a vital strategic investment in London’s infrastructure.
机译:需要花费几毫米的降雨量才能使34个污染最严重的下水道溢流(CSO)排入泰晤士河。目前,在典型的一年中,泰晤士河的潮汐溢出发生了约60次,估计溢出量为3900万立方米。英国政府和欧盟都已确定CSOn排放会对鱼类造成不利的环境影响,引入不可接受的麻醉剂,并增加泰晤士河休闲用户的健康风险,其排放频率违反了《城市废水处理指令》。 。研究表明,通过完成对处理工作的质量改进和提供一条储存和转移隧道来拦截不满意的民间社会组织,可以在最具成本效益的基础上完全实现环境目标。已经进行了广泛的建模,以开发优化的解决方案。在进行设计开发的同时,还建立了严格而全面的选址方法,以在首选的选址和方案上选址和咨询利益相关者以及公众,第一阶段的公众咨询计划于2010年晚些时候进行。伦敦Tideway隧道是必不可少的部分交付的服务,以改善潮汐河泰晤士河的水质,这一雄心勃勃的历史计划代表着对伦敦基础设施的一项重要战略投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号