On April 10, the U.S. Nuclear Regulatory Commission (NRC) issued the Final Supplemental Environmental Impact Statement (FEIS) for Dominion Energy’s application for an additional 20 years of operation for Units 1 & 2 at the Surry nuclear power plant in southeast Virginia. In its determination, the NRC concluded that the potential environmental impacts are not great enough to prevent it from considering issuing the renewed licenses for the Surry nuclear power plant. The NRC staff said it will consider the final EIS and final Safety Evaluation Report when considering whether to issue the renewed licenses. The NRC’s subsequent license renewal process determines whether the licensee of an operating reactor can extend its license for an additional 20 years beyond the previously extended license. Dominion submitted the subsequent license renewal application on October 15, 2018 (UxW32-43), for the Surry reactors, located approximately 17 miles northwest of Newport News, Virginia. Under current licenses, Surry 1 & 2 can continue operating through 2032 and 2033, respectively. With renewed licenses, the units would be able to operate to 2052 and 2053, respectively.
机译:4月10日,美国核监管委员会(NRC)发布了最终补充环境影响声明(FEIS),以供Dominion Energy在弗吉尼亚州东南部Surry核电站的1号和2号机组再运行20年。在确定中,NRC得出的结论是,潜在的环境影响还不足以阻止其考虑为Surry核电厂颁发新的许可证。 NRC的工作人员表示,在考虑是否签发新的许可证时,将考虑最终的EIS和最终的安全评估报告。 NRC随后的许可证续签过程确定了运行中的反应堆的许可证持有人是否可以将其许可证的有效期再延长20年。 Dominion于2018年10月15日(UxW32-43)针对位于弗吉尼亚州纽波特纽斯西北约17英里的Surry反应堆提交了后续许可更新申请。根据当前的许可,Surry 1和2可以分别继续运行到2032年和2033年。有了新的许可证,这些装置将能够分别运行到2052年和2053年。

著录项

  • 来源
    《Ux Weekly》 |2020年第15期|10-11|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号