首页> 外文期刊>Utilities Policy >The potential of public participation to facilitate infrastructure decision-making: Lessons from the German and European legal planning system for electricity grid expansion
【24h】

The potential of public participation to facilitate infrastructure decision-making: Lessons from the German and European legal planning system for electricity grid expansion

机译:公众参与促进基础设施决策的潜力:德国和欧洲法律规划系统在电网扩展方面的经验教训

获取原文
获取原文并翻译 | 示例
       

摘要

The article examines the potential role that public engagement and participative pro-cesses to play a role in effective infrastructure planning in the context of energy policies. For example, by 2050, at least 80% of Germany's electricity has to be derived from re-newable energy sources if Germany is to meet the goals of its own energy policy. This includes the comprehensive and accelerated extension of the electricity grid. As a result of the magnitude of these changes, the German energy transition is not proceeding without debate and controversy. Public engagement is certainly no panacea for en-hanced social acceptance, yet it offers substantial potential to facilitate the energy tran-sition. The paper draws together social science and legal expertise in order to investi-gate the role of public participation in legal planning processes concerning energy infra -structures. The paper not only focuses on the extension of the German power grid, but also deals with participative policy at the European level. To this end, the paper analyzes the potential role of the German legal planning system in grid expansion and in the European processes of nominating Projects of Common Interest (PCI) and of drawing up the Ten Year Network Development Plan (TYNDP). (C) 2016 Elsevier Ltd. All rights reserved.
机译:本文探讨了在能源政策的背景下,公众参与和参与过程在有效的基础设施规划中可能发挥的潜在作用。例如,到2050年,德国要实现自己的能源政策目标,必须至少有80%的电力来自可再生能源。这包括全面和加速扩展电网。由于这些变化的幅度很大,德国的能源转型没有辩论和争议就不会进行。公众参与当然不是增强社会接受度的灵丹妙药,但它为促进能源转移提供了巨大潜力。本文汇集了社会科学和法律专业知识,以研究公众参与有关能源基础设施的法律计划过程中的作用。该论文不仅关注德国电网的扩展,还涉及欧洲一级的参与性政策。为此,本文分析了德国法律计划系统在电网扩展以及提名共同利益项目(PCI)和制定十年网络发展计划(TYNDP)的欧洲流程中的潜在作用。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号