...
首页> 外文期刊>Underground construction >Massive Slide Rail System Keeps POMA Project On Track
【24h】

Massive Slide Rail System Keeps POMA Project On Track

机译:大型滑轨系统使POMA项目步入正轨

获取原文
获取原文并翻译 | 示例
           

摘要

The $64 million Point of the Mountain Aqueduct (POMA) project currently under construction will help meet the increasing demands for water in Utah's Salt Lake Valley. To install the 60-inch-diameter pipe that will carry as much as 77 million gallons of water per day between two water treatment facilities, general contractor W.W. Clyde & Co. is using a custom-engineered slide rail trench shoring system that is one of the longest systems of its type ever used on a project. The slide rail system, supplied by United Rentals Inc. trench safety branch in Salt Lake City, UT, was designed and manufactured by Efficiency Production.
机译:目前正在建设的耗资6,400万美元的山顶渡槽(POMA)项目将有助于满足犹他州盐湖谷对水的日益增长的需求。总承包公司W.W.要安装直径为60英寸的管道,每天在两个水处理设施之间输送多达7700万加仑的水。克莱德公司(Clyde&Co.)使用的是定制设计的滑轨沟渠支撑系统,这是该项目有史以来使用时间最长的同类系统之一。滑轨系统由美国犹他州盐湖城的United Rentals Inc.沟槽安全分公司提供,由效率生产公司设计和制造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号