首页> 外文期刊>Tunnels & tunnelling international >Evolving NATM for Santiago's Metro
【24h】

Evolving NATM for Santiago's Metro

机译:圣地亚哥地铁的不断发展的NATM

获取原文
获取原文并翻译 | 示例
           

摘要

Caverns of 150m~2 excavated just 7m-9m beneath the city streets, intersected at right angles by caverns of equal size (17m wide x 14m high) form the NATM mined stations for Santiago's new metro extensions in Chile. These impressive spaces, with 60m~2-70m~2 single-tube, double-track running tunnels between, represent some of the most advanced NATM design and excavation underway in the world today. Not only is the method sympathetic to the hectic traffic on Santiago's city streets, the NATM approach is highly cost-effective at a current US$6.5M/km of running tunnel and about US$12.5M/km for station tunnels. For Line 4, currently in design, advanced value engineering is being introduced to reduce costs further, increase productivity and improve durability.
机译:150m〜2的洞穴在城市街道下方仅7m-9m处开挖,并与相等大小的洞穴(17m宽x 14m高)成直角相交,构成了智利圣地亚哥新地铁延伸的NATM采矿站。这些令人印象深刻的空间之间有60m〜2-70m〜2单管,双线运行隧道,代表了当今世界上最先进的NATM设计和开挖。 NATM方法不仅与圣地亚哥城市街道上的交通繁忙息息相关,而且在目前运行的隧道成本为650万美元/公里,而车站隧道的成本为1,250万美元/公里时,NATM方法具有很高的成本效益。对于目前正在设计中的4号线,正在引入高级价值工程技术,以进一步降低成本,提高生产率并提高耐用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号