首页> 外文期刊>Tunnels & tunnelling international >Dywidag JV wins Algeria metro job
【24h】

Dywidag JV wins Algeria metro job

机译:Dywidag合资公司赢得了阿尔及利亚地铁工作

获取原文
获取原文并翻译 | 示例
           

摘要

A joint venture led by Dywidag International has been awarded a contract to extend partly underground Line 1 of the metro in the Algerian capital, Algiers.The contract calls for 4km of new route, more than half of which will be underground. Work has already commenced on site for the project though clearance for the approximately 32-month project is anticipated by September.Construction of the 2.7km long single bore tunnel for the metro line is to be executed by the New Austrian Tunnelling Method (NATM), said Dywidag's parent group, Strabag. Four box stations are to be built by cut and cover for the project.
机译:由Dywidag International领导的一家合资企业已获得一份合同,该合同将部分扩展阿尔及利亚首都阿尔及尔的地铁地下1号线,该合同要求4公里的新路线,其中一半以上将在地下。尽管预计将在9月完成约32个月的项目清理工作,但该项目的现场工作已经开始。地铁线的2.7公里长单孔隧道将通过新奥地利隧道法(NATM)进行施工, Dywidag的母公司Strabag说。该项目将通过切割和覆盖建造四个箱式车站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号